Sewerage & Dewatering, Pumping Station. This mammoth construction in Mirpur serves a major portion of the population density of our capital city, Dhaka.
KSB Pumps with a unit capacity of 7.33 cubic meter/second. Civil construction of pump station, surge tank, ancillary structures, secondary pump station and associated mechanical and electrical equipment supply are all Sigma’s undertakings. A total of 3 (1800mm each) discharge pipelines were installed as part of the delivery line for this facility. The facility is powered by an electrical substation {9MVA 33/6/6V} also commissioned by us.
Phase 2 construction of this unit was undertaken by Sigma and completed in July, 2015. Phase 3 was commissioned in April,2019.